Mining Safety Guide on Contingency Plans for Staff Reduction, Production Detentions or Slowdown of Operations
Related Articles inEnergy & Natural Resources
More Energy & Natural Resources Aricles → Latest Firm's PressCarey Due to the reduction to the minimum necessary staff that works in mining operations and, consequently, to the reduction of their capacity to react in the event of incidents or operational accidents,a guide for preparing contingency plans with measures to prevent these risks was approved. (Guide: Exempt Resolution No. 945 of the National Geology and Mining Service (“Sernageomin”) These plans do not need to be approved by the Sernageomin but must be maintained and disclosed to the respective personnel, in order to comply with mining safety regulations. Notwithstanding this, companies must keep Sernageomin informed in this regard as it may inspect them. Purpose of the GuideIt provides guidelines and guidance to mining companies for the preparation of plans to prevent and control unplanned but foreseeable events, and description of their capacity and immediate response activities to mitigate the damages caused and respond to emergencies in a timely and effective manner. This guide only applies in the case of personnel reductions, partial production detentions or process slowdowns for a period limited to contingencies that do not require the application of a temporary closure plan, in accordance with Law No. 20,551, on Closure of Mining Sites and Facilities. It does not include stoppages involving the complete cessation of all operations or of the main facilities of a site. ScopeIt applies to the owners of sites and facilities of the extractive mining industry, linked to the extraction of metallic and non-metallic resources over 5,000 tons per month of mineral extraction and/or processing, in addition to the extraction of liquid and gaseous hydrocarbons, regardless of its magnitude. However, companies whose mining operations are subject to Title XV of the Mining Safety Regulations may also be included. Preparation of the contingency plan for staff reductions, production detentions and/or slowdown of operationsPlans must have the following elements or sections:
Emergency or control measures after an unwanted eventThe contingency plan must include those emergency procedures which are necessary to respond in the event of an incident, in addition to the sufficient human, material and financial resources to execute them. In the event of any fatal, serious or high-risk potential event, the company is obliged to inform Sernageomin within the following 24 hours.
|
Link to article
Related Articles in
Energy & Natural Resources
- The ANH Modified CEPI Selection Process through Addenda No. 4 and 5
January, 2021 - NEPA in the Ninth Circuit: A Rare Look at Impacts to Redwood Forests and "Downstream" Carbon Emissions
December, 2020 - Brief Introduction to Indonesia’s Job Creation / Omnibus Law on Broadening of the Investment Ecosystem and Business Activities, the Ease of Doing Business and Acceleration of National Strategic Projects Oriented Towards National Interests
December, 2020 - Government Launches Long-Awaited Energy White Paper
December, 2020
More Energy & Natural Resources Aricles →
Latest Firm's Press
Carey